CONSTRUCTION DOCUMENTS

Find answers in a construction project manual without paging through it

A construction project is governed by a stack of documents: the agreement, general and supplementary conditions, specification sections, addenda and the drawings. The answer to a question about scope, submittals or a deadline can sit in any of them, and later addenda can change it. Upload the project manual and addenda, ask in plain language, and open the cited section to read the requirement before you price, build or respond to an RFI.

Creating an account needs no payment.

Last updated October 2026

How to search construction documents with Search+

  1. Upload the manual, conditions and addenda

    Add the specification volumes, general and supplementary conditions and every addendum, up to 10 files per upload. Specifications often circulate as Word files and addenda as PDFs, and both can go into the same workspace.

  2. Describe your trade and role

    In Workspace Context, write something like "We are the mechanical subcontractor; flag requirements that affect our scope, submittals or schedule, and note when an addendum changes a section." That instruction applies to every question.

  3. Ask, then check the cited section

    Ask one requirement at a time. Each answer cites the section it used, with the section number when the document has one, so you can read the full requirement and its references.

Questions people ask of construction documents

Submittals

What submittals are required for the roofing section, and what must each one include?

Addenda

Did any addendum change the specified product for the exterior doors?

Testing

Which tests and inspections are required for concrete, and who pays for them?

Warranties

What warranty period is required for the membrane roof, and when does it start?

Closeout

What closeout documents must be delivered before final payment?

Coordination

Which specification sections mention coordination with the electrical contractor?

What working with construction documents involves

Order of precedence

Contracts often say which document controls when two conflict, such as the agreement over the specifications. Read that clause before resolving a conflict.

Divisions and sections

Many projects organize specifications by division and section number. Each section typically has general, products and execution parts.

Addenda change the bid set

Addenda issued before bidding or signing modify the documents. Always check whether one changes the section you are reading.

Supplementary conditions modify standard forms

Projects often use a standard set of general conditions and change it through supplementary conditions, so both must be read together.

Mixed formats in one workspace

A bid set often mixes Word specification sections, PDF conditions and scanned addenda. Search+ takes PDF and Word files and reads scanned pages with OCR, so the whole written set can be asked about together. Keep the drawings open alongside the answers.

Answers across the whole set

Ask across every document in the workspace and the answer can draw on the manual and the addenda together, citing each source.

Common construction documents and what to ask

DocumentWhat it usually coversA question to ask Search+
AgreementParties, contract sum, contract timeWhat is the contract time and how is it measured?
General conditionsRights and duties of owner, contractor, architectWhat notice is required to claim extra time?
Supplementary conditionsProject-specific changes to the general conditionsWhich general conditions are modified for this project?
Division 01 general requirementsSubmittals, meetings, quality, closeoutWhat is the submittal review period?
Technical specification sectionsProducts, materials, executionWhich manufacturers are listed for this product?
AddendaChanges issued before signingWhat did Addendum 2 change?

What are construction documents?

Construction documents are the written and graphic documents that define a building project: the agreement, the conditions of the contract, the specifications and the drawings, together with any addenda and later modifications.

A construction contract is one part of this set: the agreement between the owner and the contractor. Construction documents also include the specifications and drawings that define the work.

Construction document questions

Can Search+ find a requirement buried in a long project manual?
Yes. Ask what is required and Search+ answers from the manual with a citation to the section, so you can read it in full.
Will it tell me if an addendum changed a section?
Upload the addenda with the manual and ask whether any addendum modified a section. The answer cites the addendum and the original text it changes.
Our specifications are Word files and the addenda are scans. Can I use both?
Yes. Upload the Word sections and the scanned addenda to one workspace; Search+ reads scans with OCR. Check the cited text on any faint or marked-up addendum page against the issued copy.
Can I list every submittal requirement for my trade?
Ask for the submittal requirements in the sections that cover your work. The answer cites each section; check the list against the manual, since an AI answer can miss items.
Is an answer from Search+ a contract interpretation?
No. Search+ helps you find and read the documents. It is not legal or design advice, so take interpretations to the architect, engineer or your contract adviser through the project's formal process.